← NewsAll
China's Open-Sea Solar Plant Prompts Environmental and Industry Questions
Summary
China has begun building a gigawatt-scale open-sea solar farm off Shandong province covering about 1,223 hectares and expected to produce roughly 1.78 billion kilowatt-hours a year; the project, built by China Energy Investment Corporation, includes integrated fish farming but no independent environmental analysis has been released.
Content
China has begun construction of a gigawatt-scale open-sea solar farm off Shandong province, drawing attention because of its size and design. The project follows rapid growth in China's solar manufacturing and uses large floating platforms with photovoltaic panels. Developers say the site will include integrated fish farming and is engineered to withstand strong gales and icy conditions. Reporting notes that no independent environmental analysis of this specific project has been published so far.
Key details:
- The installation covers about 1,223 hectares and uses 2,934 photovoltaic panels mounted on platforms roughly 60 by 35 meters each.
- CHN Energy (China Energy Investment Corporation) is leading construction and expects about 1.78 billion kilowatt-hours of annual generation, which the article reports could serve over 2.6 million households and reduce about 1.3 million tons of CO2 per year.
- The project design includes integrated fish farming and is intended to handle strong winds and icy conditions.
- No independent or state-backed environmental analysis of the Shandong offshore project has been released, according to reporting.
- Experts and conservation groups have reported potential ecological concerns from floating solar projects in other contexts, including reduced light penetration, temperature changes, altered oxygen levels, growth of shade-tolerant algae, and risks from microplastics or heavy-metal leaching.
Summary:
The Shandong open-sea solar farm would add large-scale offshore capacity and is presented with aquaculture integration and structural measures for harsh weather. At the same time, reporting highlights that independent environmental study of this specific project is not yet available and that experts have raised possible ecological risks based on similar projects elsewhere. Undetermined at this time.
